- Its a smaller chunk to finance
- Moscow's Intermodal Transit Center is considering the northern portion of the site. (reportedly the site is priority 3)
Within the southern portion, this is my first study of parking lot and building footprints. Several questions and issues have become aperant.
- The 530 foot dimension needs to be shortened to contribute half to making of a public path. (need to see the design overlay for path width)
- The creek side needs a pedestrian path. 10 feet setback from the property line is shown for this purpose.
- Can an easement with UI help widen this path?
- How will fire access work along this side?
- The eastern face is built to the property line. Fire access is assumed in the right of way along the old Main St alignment.
- The northern side shows a 15 foot pedestrian path - otherwise build to property line would close off all pedestrian access in an E-W route.
First sketch 12.29.2010 includes:
- 19 row houses (ave width 22 feet, depth 45 feet)
- one parking stall for each row house (either in garage or in alley)
- 44 stall parking lot interior to the block (at grade). Need to explore converting this space to structured parking.
- 4 building sites: 7000, 6700, 2900 and ?? sqft footprints.
- A 10x24 foot loading dock off the end of the alley.
- Two mid-block passageways 10 feet wide.



